• Biologics Modular

CBD Modular Cleanroom - Completed Projects

Updated: Feb 19

Heartland Harvest Processing asked Biologics Modular to design and build a clean space to allow them to carry out their post extraction refinery activity with the CBD crude oil. The room required high ceilings, a 9’ high entry door for their equipment and a special HVAC system that would draw from outside air and pass it through a HEPA bank prior to delivery. The whole room was built on a false floor in order to help provide a level starting point.














Biologics Modular Logo

BIologics Modular Facilites

A Ratchet Industries Project

P: 317-456-9191

E: cbyrum@biologicsmodular.com

1533 E Northfield Dr. #800 | Brownsburg, IN 46112